This virtual tour will introduce participants to the design and construction of the Woody Ward Park Stormwater Retrofit Project in DC. The project’s primary goal was to treat as much stormwater as practical through a variety of practices. Ultimately, the project addressed larger community concerns of engagement, long standing illegal dumping, and concerns for crime and safety. Participants will be able to see time lapse photography of construction photos and experience the construction process for this 8.5-acre site. Participants will interact with the DOEE and DPR and design representatives as part of a roundtable discussion focused on design and permitting and construction and post construction.
1.5PDH/HSW APPROVED.
Kommentare